Products
The oil (gas) fuel steam and hot water boiler has a reasonable and compact overall structure, meeting the conditions for quick installation and factory delivery. This product consists of three main parts upon delivery from the factory: the boiler main unit, chimney, and piping system. The main unit and chimney are manufactured in the factory. The piping, valves, and instruments are installed with the main unit. Upon arrival at the site, the main unit and chimney are assembled. The fuel source, power supply, and water pipes are connected on-site before testing. This greatly shortens the installation cycle and ensures product quality.
Contact Us
Sales Tel: +86-0532-58710666
Sales Tel: +86-13335063629
After-sales Tel: +86-0532-58710332
After-sales Tel: +86-13969678003
Email: qdjp-zh@163.com
Address: Qingdao High-tech Industrial Development Zone, New Materials Group
Copyright © 2025 Qingdao Junpeng Petrochemical Equipment Manufacturing Co., Ltd